Vopak Horizon Fujairah Ltd. (VHFL)

Albanna Engineering is the main contractor for this important EPC project for Connecting Vopak Terminal to POF Matrix Manifold. The scope includes Engineering, procurement and construction of 2nos 24” and 30” pipe line each from VHFL to OTB2 Matrix Manifold, total of 16 KM. Also includes associated civil and E&I work

Civil Works includes pipe sleepers, pipe bride foundations, and culvert. Structural Steel works consist of construction of pipe bridges and pipe rack.

             1          3          5                                 
             6     7     8

The construction period was 11 months. 

Customer :VOPAK HORIZON FUJAIRAH LTD.
Consultant : ENOC 
Construction Period :
2012 - 2013
Piping : 70,000” Ø
Painting : 38,000 SqM
Structural Works : 1,000 Tons.
Concrete Works :6000 CuM