Mechanical and Piping Works for Refinery Debottlenecking Project

Albanna Engineering was the main contractor for the Refinery Shutdown works to increase capacity of the refinery by 20,000 barrel per day (bpd) to 140,000 bpd. Plant Shutdown was planned for 14 days and was abe to successfully complete the shutdown works as planned.

Scope of work includes supply of labour, consumables, plant and equipments, engaging specialized subcontractors for Catlyst Loading, Internal Tray removals, Tube Bundle replacement works and Heavy lifts.

Customer :EPCL
Consultant : ENOC
Construction Period : 2012
Structures : 500 MT
Equipment : 1000 MT
Piping : 95000 Inch Dia
Heavy Lifts : 1000 MT
Peak Manpower : 950 Nos

 