EPCL - Berth 9 Piping Works

Albanna Engineering was contractor for Piping, Structural, Loading arm and Pump erection for Berth 9 facilities for EPCL.

The scope includes installation, testing, painting and commissioning of product pipe lines from Berth 9 to Berth 1 valve station wiht tie-ins to Berth 3 and Berth 7. Erection of 11 nos of loading arms and slop pumps with commissioning assistance also forms part of the scope along with civil works for undergroung piping from Valve station to Berth 3 and structural supports and operating platforms.

Albanna Engineering has successfully executed this 4 month project in time to the satisfaction of client.

Customer :EPCL (ENOC Processing Company LLC)
Consultant : Tebodin
Construction Period : 2009 - 2010
Piping : 45,000” Ø, 30" pipe - 1Km, 20" - 3Km, 16" - 2Km
Painting : 14,000 SqM
Wrapping : 1,800SqM
Structure : 350 Tons